FAQ's

Snagging is the necessary process of inspecting and identifying any defects/faults or issues within a new-build home. This process is carried out by thoroughly surveying the property and creating a “Snagging List”.

This “Snagging List” is then used to compile all defects/issues into one report, to then pass onto the developer/builder for them to rectify.

Understanding Snagging Surveys

Below is a list of the frequently asked questions we receive at Acuro Snagging.

Do you have a question not listed below? Get in touch to discuss it with a member of our expert team of professionals who will be more than happy to help!

A snag is a defect found in your property after building work is complete.

A snag is typically something that is damaged or broken, not fitted properly, or generally unfinished or incomplete.

Snags vary from minor to major but are typically minor cosmetic issues, such as a scratch on a window, a missing door hinge, or a crack on a work surface.

However, minor snags may not cause problems in the short term but if these are not rectified in an appropriate manner, they can become a more serious issue in the future.

Major snags on the other hand are still very common and should be dealt with immediately as these generally violate building regulations and technical standards.

These kind of major snags are typically missed by the average home owner, without the experience and training or the correct equipment that is necessary to identify them.

Our inspectors are all experienced professionals and work to current building regulations and technical standards to ensure all snags, minor and major, are identified and reported.

Snagging is the necessary process of inspecting and identifying any defects/faults or issues within a new build home. This process is carried out by thoroughly inspecting the property and reporting any issues to the builder to rectify them.

Any snags reported that are a breach of the warranty providers technical standards or building regulations, the builder will be responsible to rectify them as a part of the builder’s two-year warranty.

This two-year warranty period is a vital time for homeowners and any snags/defects should be reported as soon as possible and listed into a ”Snagging List/ Report”

Anyone that is buying, or has already purchased, a new-build property within the last two years will benefit from a professional snagging survey.

If you want to make sure your property is built to a high build standard or would like peace of mind that your home has been built safely, a snagging survey is what you require.

A professional snagging company are able to provide comprehensive reports gained through years of experience and training. This is essential as snagging is a task that requires extensive knowledge of the build process, regulations and warranty provider tolerances.

The average home owner will not have the industry experience or know what each trade does and what is considered acceptable under the warranty provider.

A professional inspector on an average property can generally find anywhere from 100 – 250 snags per survey and this can be more, depending on the build quality. Relevant warranty providers building standards are also referred to and included within our snagging reports for each defect. This is an important feature as this helps provide clarity and understanding of each defect to get them resolved by your developer.

The benefits linked with using a professional snagging company are too great to not go ahead for the price paid for the property.

The question should be “Could you afford to miss costly defects that should have been corrected during the builders two year warranty period?”

The best time to have a survey completed is prior to legal completion as this would allow the developer to complete the works detailed on the snagging report before you move in.

Unfortunately some developers do not allow access to the property prior to completion so we recommend getting booked in within the first 5 days of completion. Most developers have a specific time period for home owners to report any initial snags, this can differ from 7 days, 14 days or on rare occasions 28 days. The best time to report all snagging items is as soon after completion as possible, this is because the builder will take more responsibility for any reported snags, even for minor snags identified such as chips or damages.

Although it is best to report any snagging items as early as possible, it is still beneficial to book a snagging report anytime up to two years after completion. This is because most developers will offer a two year warranty period on their new homes. This allows the time for the building to settle and any major defects which may have not been identified can be reported and dealt with.

If you are wishing to book a snagging survey before completion, it is important that a date can be agreed by your developer in writing to allow us to have full access to the property without any disruptions for a full day. Building Control and Warranty Sign-off would also have to be provided to ensure that the house is ready for surveying.

Our snagging inspectors will thoroughly examine all areas that can be visually accessed both internally and externally on each property. We will identify any cosmetic issues or damages as well as plumbing, electrical, carpentry, loft and cavity wall insulation issues (with our thermal camera), tiling, mastic, cleaning, plastering, painting and all external finishing. We check that every property is compliant to technical standards and building regulations and include a thermal imaging service to gather evidence to defects that require further investigation. Our thermal imaging will identify any cold spots or draughts around windows or doors and can find faults with heating systems like radiators or under floor heating. Our goal is to leave you feeling satisfied knowing that your new home will be finished to the quality which you expected.

Once a booking has been made, one of our Acuro Snagging surveyors will arrive at your property at your convenience, to carry out the survey of your home.

The snagging inspector will carry out a thorough examination of all aspects both inside and outside of your home. During the visit the inspector will photograph and log detailed descriptions of all defects found with your home. Once the visit is complete and all defects have been logged, our inspector will compile all the information into an electronic report. This report will then be sent across to our dedicated quality control team to check for accuracy and detail. Once the quality control team are happy with the report, the electronic snagging report will be sent across to the homeowner via email, to be passed on to the developer. We are able to advise on the best place or person to send the report to.

Once the report has been received by the builder, they will then have to work through and rectify all of the reported issues within the electronic report to the customers satisfaction.

The time it takes to survey a property will depend on the size, the type and the quality of build of each home.
 
But a good guide is on average, a two bedroom semi detached house will usually take between 3-6 hours and a five bedroom detached house will take between 6-9 hours.
The amount of snags that are identified per survey will be dependent on the build quality and the size of the property that is undergoing an inspection, although we will typically identify 155 snags on average in a two storey semi-detached three bedroom house.
 
Note, these numbers can be significantly lower or higher than this.

No.

A snagging survey’s sole purpose is to identify any defects or ‘snags’ caused by poor workmanship, construction or design defects and whether all compliance to building regulations or technical standards have been met.

A structural survey is a complete building survey which will outline the likely cause of any problems, repair options, the urgency of repair and the likely consequences of ignoring issues. It will also include a schedule of works that are required to fix the reported issues and the likely costs of repair and labour.

Although it is especially important to know that any defects that are reported within the ‘’Snagging List’’ must be proven defects. Proven defects are issues that are breaches or a non-conformance of the warranty providers technical standards or building regulations. Any defects or issues raised within the ‘’Snagging List’’ that are proven to be a breach of the warranty providers technical standards or building regulations, the builder will be responsible to rectify these as a part of the builder’s two-year warranty.

 

This two-year warranty period is a vital time for homeowners and any snags/defects should be reported as soon as possible and listed into a ”Snagging List/ Report”.

We understand and have a wide range of knowledge in new-build construction, allowing us to inspect your home with reference to warranty technical standards, tolerances, and UK building regulations. Our surveyors and expanding team, are professionals in the industry, holding affiliate membership with both the Chartered Association of Building Engineers (CABE) and Residential Property Surveyors Association (RPSA). We are able to identify and establish proven defects with your home, compiling our findings in one professional and user friendly report. 

End of warranty surveys are for those that have already completed their house purchase, living in their new home longer than 3 months, but are still within the developers two year warranty period. This type of survey is designed to identify and report breaches of Structural Warranty Standards and Building Regulations only, without inspection of minor cosmetics defects, at a reduced fee. It is important that issues are raised inside the two year period, as costly defects will no longer be the developers responsibility once out of this timeframe. 

We require as much notice as possible due to the number of snagging surveys we carry out each month – as a minimum, we recommend between four and six weeks notice. As it is common for completion dates to be arranged at short notice, it’s always worth contacting us to see if we have any earlier availability should you require it.

There are a number of different new build structural warranty providers in the industry, each with a different set of standards of expectation for developers. Our reports focus on the three largest in the UK, NHBC, Premier Guarantee and LABC. If your structural warranty is provided by an organisation not listed here, please get in touch and we will discuss how this will affect your report.

Acuro currently offer 3 types of survey, a Platinum, Gold, or De-Snag Service. All our Surveys include Warranty Provider standards and Building Regulation referencing throughout the report, priorities, marked up images and detailed descriptions.

Further details on this and much more can be found on the Our Surveys page.

A de-snag service is offered to customers who have already had a snagging survey completed with us, but would like us to come back and check all the defects have been completed, and meet the required Warranty provider standards and Building Control regulations.

Further details on the De-Snag service can be found on the Our Surveys page.

A post completion is the point after you legally own the property and have the keys.
A pre-completion is the point before you legally own the property and before you have the keys.

We always recommend customers have their snagging survey completed once they legally own the property and have their new home keys in their possession.

We can complete a survey prior to you owning the property, and in these cases, this is usually by arrangement with the developer.

As our detailed surveys take the whole day to complete, it is not usually possible to carry out the inspection on completion date. Quite often, we find developers will not release the keys to the property until the customer legally owns it. Sometimes the transfer of funds (legal completion) can be very late in the day, so unfortunately, this would not be possible unless you have written agreement from the developer or site manager.

No, you do not have to be present during the survey. All we ask is that you make the keys available to us between 8.00am-8.30am in the morning and the keys can be returned to the homeowner by arrangement. Of course, if you prefer to be present, then that’s no problem either.

You can book you survey as far in advance as you wish. If for some reason your circumstances change, all we ask if for 3 clear working days prior to the survey taking place to reschedule your booking. Please note, we do not take payment for the survey until 3 clear working days prior to the survey, so there is absolutely no financial risk to you.

Ideally, we prefer the property to be empty at the point of survey, as this gives us the best opportunity to survey your home in detail.  However, we understand that customers are keen to move in and unpack and settle into their new home, so we are more than happy to work around you. Obviously, any areas that are inaccessible due to boxes or placed furniture etc. would not be inspected, as we would not normally move customers personal items for health and safety reasons.

Please check your booking confirmation email for our “Getting Ready for Survey Guidelines” to give you an idea on how to prepare for the survey.

Platinum – 0-12 weeks – If you are about to or have just moved in to your new home and want us to check at everything, inside and out, including cosmetic damages, technical and safety aspects, drone survey and thermal imaging scan.

Gold – 0-6 months – If you are outside the developers cosmetic damages reporting period and you want us to check the technical and safety aspects, inside and out, excluding any cosmetic damages, and includes a drone survey and thermal imaging scan. 

Silver – 6-23 months – If you are nearing the end of your two year developer warranty and want us to check the technical and safety aspects inside and outside the property and includes drone survey and thermal imaging scan.

Bronze – 0-23 months – This is our budget survey which can be carried out anytime from move in, to the end of the 2 year warranty period and you just want us to look at the technical and safety aspects, inside and outside the property and includes a drone survey.

For properties up to 1400 square feet or 130 square metres most surveys take the full day to complete. For properties over this size, we would need to provide a quotation.

All our surveys are carefully prepared at our office following the survey, and this process can take up to 5 working days after your survey has taken place. Please do let us know if you need to send your survey to the developer by a particular deadline, so we don’t miss it!

We usually take payment for the survey 3 clear working days prior to the survey.

There is now a new type of Survey option, which is called a PCI (Pre-Completion Inspection) and this is usually offered to you by the developer (if they have signed up to the RPSA/NHQB standards). This type of survey is usually carried out during your new home demonstration.

The NHQB PCI Checklist/template that must be followed in this case, is very restrictive and your surveyor would only be able to report on cosmetic scratches, damages, decoration and plastering issues. We would not permitted to check your property has been built to Building Regulations or Warranty Provider Standards (such as NHBC). 

We have set out below a table to compare a PCI Inspection against a regular Snagging survey, as you can see there are very different but very similar in price.